MIL-DTL-15606J
TABLE II. Sampling for first article and conformance inspection.
Inspection
Test paragraph
Inspection level
Workmanship
S-1
Dimension
Standard shape brick
S-3
Special shape brick
S-3
1/
Burner tile
Warpage
1/
Standard brick
1/
Special shape brick
1/
Burner tile
1/
Chemical analysis
1/
Pyrometric cone equivalent
1/
Permanent volume change
1/
Modulus of rupture
1/
Stability
1/
Permanent linear change
NOTE:
1/
Sample size and accept or reject criteria as specified in test
paragraph and contract.
4.3 First article inspection. First article inspection shall include the examinations of 4.5 and the tests of 4.6, as
TABLE III. First article inspection.
Test
Test paragraph
Requirement paragraph
Visual Examination
Chemical analysis
1/
Pyrometric cone equivalent
or 3.9.1
Permanent volume change
Modulus of rupture
Stability
Permanent linear change
NOTE:
1/
The PCE test for Grade A brick (or tile) is required for the initial first article
test in accordance with 3.8.
6
For Parts Inquires call Parts Hangar, Inc (727) 493-0744
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business